Legal Regulations & Compliance

EPR Registration and Compliance Setup for New E-Waste Dismantling Facility Patiala Punjab

Posted 01 Aug 2026
By Anil Kumar
Open for Bids
Description

A company in Punjab is seeking an end-to-end consultant to facilitate EPR Registration for a new authorized E-Waste Collection, Dismantling, and Metal Recovery facility at Industrial Focal Point, Patiala, covering a 500 sq. yard plot. The scope requires comprehensive support across environmental and state compliance (PPCB CTE/CTO approvals and Invest Punjab portal filings), industrial plant layout engineering aligned with CPCB guidelines, and enterprise tech readiness including Bank-Grade Data Destruction SOPs and NIST-compliant certification frameworks. The requirement is urgent, with a target turnaround of within two weeks, as the business is starting fresh with no existing registrations.

Requirement Details
Type of Regulation
EPR Registration
Waste Category
E-waste
State / Region
Punjab
Existing Registrations
None — starting fresh
Company Type
Dismantler
Timeline
Urgent — within 2 weeks
Budget Range
no
Additional Context
Dear Team,I am planning to set up an authorized E-Waste Collection, Dismantling, and Metal Recovery facility in Punjab and am seeking an end-to-end consultant to manage the licensing, factory layout engineering, and tech compliance frameworks.Below are our project details:Location: Industrial Focal Point, Patiala , Punjab. Plot Size: 500 Sq. Yards (Gaj).Business Model: Authorized collection, manual dismantling, data destruction, and base metal/PCB trading. (Note: We are NOT doing chemical extraction or acid leaching at this stage).Target Clients: Corporate IT Hubs (Mohali/Chandigarh), Banks, and Government Tenders (PSPCL/GeM).We require a consultant who can execute a complete Scope of Work (SOW) across three main areas. Please confirm if your firm can provide the following services:1. Environmental & State Compliance (PPCB & Invest Punjab)Filing and securing Consent to Establish (CTE) and Consent to Operate (CTO) under the appropriate PPCB category.Routing applications through the Invest Punjab Business First Portal to claim maximum policy benefits (100% Stamp Duty Exemption, Electricity Duty Waivers, and Capital Subsidies for Green/Circular Economy sectors).2. Industrial Plant Engineering & Layout DesignDesigning the 500 gaj factory floor blueprint to comply with Central Pollution Control Board (CPCB) guidelines.Structuring dedicated zones for un-segregated inbound waste, manual dismantling bays, an ESD-compliant data destruction lab, and isolated hazardous material storage (PCBs/Batteries).3. Enterprise Tech & Audit ReadinessAssisting in setting up standard operating procedures (SOPs) for a Bank-Grade Data Destruction Workflow (Degaussing + Physical Crushing).Providing or integrating documentation frameworks for generating NIST-compliant Data Destruction Certificates and ESG/Sustainability Reports for corporate clients.Kindly let me know your availability for a brief introductory call this week to discuss your commercial fees, estimated project timelines, and past experience handling e-waste setups in Punjab.Looking forward to your prompt response.Best regards, 7015297740
Anil Kumar is looking for an expert like you
Get in touch directly to discuss the requirement and share how you can help.
A
Anil Kumar
Requirement Seeker
View Contact →

Interested in this requirement? Place your bid to connect with the seeker.

Place Bid →
List your company and reach new clients
Join hundreds of environmental companies growing their business on MyWasteSolution
Get Started →